
Pressurized Spectra III ™ Series

Português
Italiano
Français
Deutsch



ease of installation, the dome system should be assembled, pressurized, and tested before installation. A Pressurized Spectra III cable harness (supplied with the back box) is required to test and monitor the pressurized dome.
sistema. Para obtener mejores resultados y una instalación sencilla, el sistema de domo debe ensamblarse, presurizarse y probarse antes de la instalación. Se requiere un arnés de cableado del Spectra III Presurizado (suministrado con la caja posterior) a fin de probar y monitorear el domo presurizado.
Para obter melhores resultados e facilitar a instalação, o sistema de dome deve ser montado, pressurizado e testado antes da instalação. Um módulo de cabo pressurizado Spectra III (fornecido com a back box) é necessário para testar e monitorar o dome pressurizado.
ottimali e per facilitarne l'installazione, il sistema dome va montato, pressurizzato e collaudato prima dell'installazione. Al fine di collaudare e controllare il dome pressurizzato, occorre disporre di un cavo Spectra III (in dotazione al contenitore).
l'installation et obtenir les meilleurs résultats possible, assemblez, pressurisez et testez le système de dôme avant de l'installer. Un faisceau de câble série Spectra III pressurisée (fourni avec l'embase) est requis pour tester et surveiller le dôme pressurisé.
Domesystem vor der Installation zusammenzubauen, unter Überdruck zu setzen und zu testen. Zum Testen und Überprüfen des unter Überdruck gesetzten Dome wird der mit der Back-Box gelieferte Kabelsatz für das Spectra III Domesysteme mit Druckgehäuse benötigt.

1 Loosen the V-band attached to the back box and let it hang to the side.
2 Prepare the lower dome for installation:
a. Remove the O-ring from the lower dome.
b. Lightly apply O-ring lubricant (supplied) to the O-ring.
c. Reinstall the O-ring in the groove on the trim ring.
3 Attach the back box leash to the lower dome, and let the lower dome hang to the other side of the back box.

a. Set the DIP switches located on the side of the dome drive.
Refer to the labels located on the top of the dome drive or to the Quick Start Guide shipped with the dome drive.
b. Line up the blue (A) and red (B) tabs with the blue (A) and
red (B) labels.
c. Push in on the tabs. Insert one side and then the other side.
Continue pushing until both sides of the dome drive click into place.
a. Position the lower dome so that the blower duct inside the
back box is between the studs attached to the inside of the lower dome.
b. Install the V-band around the lower dome and then tighten the
fastener of the V-band.
c. Test and check the operation of the unit before pressurizing
the dome.
a. Remove the cap from the Schrader valve of the dome. Place
the air chuck from the charging kit over the Schrader valve of the dome system.
b. Open the tank valve of the charging kit. Fill the dome with
nitrogen for a minimum of five minutes to replace the oxygen inside the dome with nitrogen.
c. Remove the air chuck and then replace the Schrader valve cap.
d. Refer to the Operation/Programming manual for instructions
on how to view the current readings for the temperature and pressure. Record the initial temperature and pressure readings of the dome in the space provided below:
Initial Temperature Initial Pressure



Feed the supplied wiring harness into the front of the mount and out the back of the mount. Connect the wires as required. Refer to Tables A, B, and C for cable and wiring information. Fasten the mount to the mounting surface. Refer to the instructions supplied with the mount.
Remove the back box mounting plate: Loosen the nuts on top of the back box, and then turn the mounting plate clockwise and lift.


Thread the wiring from the mount through the mounting plate, and then attach the mounting plate to the mount. If outdoors, apply thread compound (provided) to the threads on the mounting plate.
Attach the connector of the wire harness to the mating connector located on the top of the back box. Insert the studs and nuts on top of the back box into the mounting plate, turn the back box counterclockwise, and then tighten the three nuts.

Table A. Video Coaxial Cable Requirements
Table C. Configuration of Wire Harness
Table B. 24 VAC Wiring Distances
Use a 24 VAC transformer with a minimum of 100 VA.
I possessori del prodotto e il nostro team di solito rispondono entro 24 ore, e la tua domanda sarà utile anche ad altri.
Invia la prima domanda: risponderanno altri possessori o il nostro team.