Manuale d’uso / di manutenzione del prodotto 500 del fabbricante Honeywell
Vai alla pagina of 16
INST ALLATION INSTRUCTIONS 62-0304-05 Class 500 Advanced KWh/Demand Meter APPLICATION The Class 500 Meter is a 3-element meter with commu nications. The device is used to moni tor electric power usage of ind ividual loads after the utility meter .
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 2 S PECIFICATIONS Input V oltage Configuration: 3-wire (Delta) or 4-wire (WYE) Mains V oltage Input: Up to 600 V AC RMS available Input Power: 6 V A maximum rating Current Sensor Rating: Up to 3200 Amp RMS AC available Power Factor: .
CLASS 500 ADVANCED KWH/DEMAND METER 3 62-0304—05 INST ALLATION VERIFY the input voltage rating and configu ration on the unit panel label to ensure it is suitable for the intended e lectrical servic e. Meters labeled for 1 15/208 volt service MUST NOT be installed on service feeds of 277/4 80 volt and vice versa.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 4 Main Power Board Connections to this board include the MA INS input voltage, current sensors, an d external pulse input (See Fig. 2). The MAINS input terminals are covered with a protective clear sh ield fo r safety purposes.
CLASS 500 ADVANCED KWH/DEMAND METER 5 62-0304—05 d. Connect the three AC mains power wires (PHASE A, PHASE B, and PHASE C) to their respective po sitions as labeled on terminal block TB1.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 6 Fig. 3. Split core current sensor assembly . Fig. 4. Split core current sensor assembl y installed. IMPORT ANT : When looking from the source side of the conductor(s) bein g monitored, you should see the arrow on the current sensor assembly .
CLASS 500 ADVANCED KWH/DEMAND METER 7 62-0304—05 Fig. 7. Location of LED D5 (lab eled “MTR”) and Ethernet board. V erify that the AC MAINS vol tage wires ar e all connected to the correct posi tions on terminal block TB1. Inspect the MAINS inp u t wiring to verify each conductor is terminated at the correct te rminal block positi on.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 8 Wiring to the Network RS-485 Wiring for BACnet MS/T P , Modbus RTU, or EZ-7 The Class 500 Meter contains an RS-485 serial communications port allowing it to commu nicate via BACnet MS/TP , Modbus RTU, or EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 9 62-0304—05 The meter is shipped with a Modb us ID number of 01. This must be changed if the network has more than one meter installed.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 10 Fig. 1 1. LON wiring . Ethernet wiring for BACnet IP , an d Modbus TCP/IP and Ethernet EZ-7 These models are shipped with a board that a llows for Ethernet commun ication via Modb us TCP/IP , BACnet IP or Ethernet EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 11 62-0304—05 NOTE: One set of current sensors equates to th ree sensors, one per phase. The multiplier only appli es when extra sets of cur- rent sensors are installed on one Class 50 0 Meter . Therefore, if you are using on ly one set of three current sensors, the multiplier is not required.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 12 MAINTENANCE The Class 500 Meter unit is shi pped in a calibrated an d fully fu nctionally tested condi tion. Sinc e the u nit is factory calibrat ed using proprietary firmware algorithms, no internal uni t adjustments ar e nece ssary .
CLASS 500 ADVANCED KWH/DEMAND METER 13 62-0304—05 Use the following procedure to re place the lithium battery cell. 1. Disconnect power from the Class 500 Meter at the unit external circuit breaker . 2. Remove the battery from its socket and place it on a non-conductive surface.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 14 Modbus Point Map Modbus data points available from the Class 5 00 meter . Listed under Class 500. T able 4.
CLASS 500 ADVANCED KWH/DEMAND METER 15 62-0304—05 NOTE: T o change device ID, set single point at 46049 with data set to new device ID (e.g., 1 to 247). T o set date/time, set multiple points at 46025 for 4 points with data set to HHMM SSDW MMDD YYYY (DW=day of week).
CLASS 500 ADVANCED KWH/DEMAND METER Automation and Co ntrol Solutions Honeywell Internationa l Inc. 1985 Douglas Drive North Golden Valley, MN 55422 customer.honeywell.com ® U.S. Regi stered T rademark © 201 1 Ho neywell International Inc. 62-0304—05 M .
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il Honeywell 500 è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del Honeywell 500 - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso Honeywell 500 imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul Honeywell 500 ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il Honeywell 500, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del Honeywell 500.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il Honeywell 500. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo Honeywell 500 insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.