Manuale d’uso / di manutenzione del prodotto Upflow del fabbricante Allied Air Enterprises
Vai alla pagina of 28
AFFIX LABEL HERE INSTALLATION AND SERVICING INSTRUCTIONS UPFLOW, DOWNFLOW OR HORIZONTAL TWO STAGE HEAT VARIABLE SPEED GAS-FIRED NON-CONDENSING WARM AIR FURNACE Issue 0527 TABLE OF CONTENTS Safety ........................................... 2 Furnace Specifications .
SAFETY The following is a list of safety precautions and their locations in this manual. These safety rules and precautions must be followed when installing this furnace. 1. Use only with type of gas approved for this furnace. Refer to the furnace rating plate.
FURNACE SPECIFICATIONS MODEL UNIT DIMENSIONS DUCT SUPPLY OPENING DUCT RETURN OPENING VENT PIPE DIA. MAX. OVER CURRENT PROTECTION MAX. UNIT AMPS ELECTRICAL SUPPLY MIN. WIRE SIZE(AWG) TEMPERATURE RISE RANGE NET WEIGHT LBS LENGTH WIDTH HEIGHT A B C D E F G H LOW FIRE HIGH FIRE AV050B3 29 1/2 13 1/2 38 1/4 11 1/2 20 3/8 12 21 5/8 4 15 9.
BLOWER MOTOR SPECIFICATIONS AND AIRFLOW ADJUSTING DATA Adjusting Airflow MODEL MOTOR HP BLOWER WHEEL HEAT SETTINGS COOL SETTINGS HEATING CFM @ .50 STATIC COOL CFM @ .
FURNACE WIRING SPECIFICATIONS 20571201 Issue 0527 Page 5 of 28.
The furnace cabinet must have an uninterrupted or unbroken electrical ground to minimize personal injury if an electrical fault should occur. The unit must also be electrically grounded in accordance with local codes, or in the absence of local codes, with the latest edition of the (U.
LOCATION / PLACEMENT Site Selection : This furnace may be located in an attic, closet, basement, crawl space, alcove or suspended from the ceiling of a utility room or basement. Select a location that will meet all requirements for safety, clearances, ventilation and combustion air, ductwork design, gas piping, electrical wiring and venting.
If the furnace is to be installed in a crawl space, consult local codes. (Use of a concrete pad 1" to 2" thick is recommended.) If the furnace is to be suspended from the ceiling, it will be necessary to use steel pipe straps around each end of the furnace.
If the installation area meets the definition of "Unconfined Space" and does not have additional air requirements as described, the furnace may be installed without making special provisions for combustion and ventilation air.
Figure 4 CONFINED SPACE / OUTDOOR AIR FROM ATTIC Figure 5 CONFINED SPACE / OUTDOOR AIR FROM ATTIC & CRAWL SPACE For an attic installation it is important to keep insulation 12" or more away from any furnace openings. Some types of insulating materials may be combustible.
DUCTING The proper sizing of warm air ducts is necessary to insure satisfactory heating operation. Ductwork should be in accordance with the latest editions of (U.S.) NFPA-90A ( Air Conditioning Systems ) and NFPA-90B ( Warm Air Heating and Air Conditioning Systems ) or Canadian equivalent.
Filters: Air filters must be used in every installation. For side return installations, air filters must be installed external to the furnace casing. An external filter rack kit with filter (parts No. 20069901 or Cat. No. 68L75 12 / 15½" x 25" sizes and 20069902 or Cat.
vent. If deterioration is discovered, the chimney must be repaired or the "B" vent must be replaced. 2. Inspection to ascertain that the vent system is clear and free of obstructions. Any blockage must be cleared before installing this furnace.
4. All pipe should be supported using the proper clamps and/or straps. These supports should be at least every four (4') feet. 5. All horizontal runs of pipe should have at least a 1/4" (in.) per foot of upward slope from the furnace to the vent terminal.
CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death.
Figure 11 AUTOMATIC HEAT STAGING JUMPER When installing optional accessories to this appliance, follow the manufacturer's installation instructions included with the accessory. The unit cabinet must have an uninterrupted or unbroken electrical ground to minimize personal injury if an electrical fault should occur.
This furnace is manufactured for use with Natural gas and must be converted using the proper LP conversion kit for use with LP (Propane) gas. For LP (Propane) gas, a tank regulator is required to reduce supply pressure to 12"-13"w.c. For manifold pressure see Table 6.
Cooling Mode : The units are factory set for the highest airflow for each model. Adjustments can be made to the cooling airflow by repositioning the jumper plug marked COOL - A, B, C, D (see AirFlow Adjustment Table on page 4) based on the information found in the table.
STARTUP AND OPERATIONAL CHECKOUT It is not recommended that this furnace be used as a construction heater during any phase of construction. Very low return air temperatures, harmful vapors and operation of the unit with clogged or misplaced filters will damage the unit.
The gas control (Figure 13) has two separate pressure regulator adjustment screws, one for 1 st stage (marked "LO") and the second one for 2 nd stage (marked "HI"). The adjusting screws are positioned on either side of the barbed fitting.
Burner Orifice Sizing: The furnace is supplied with standard orifices for the gas shown on the rating plate. Table 6 shows combinations of heating values and specific gravities for various gases, from which proper input can be obtained.
Limit Control Checkout: After the furnace has been in operation for at least 15 minutes, restrict the return air supply by blocking the filters or closing the return registers and allow the furnace to shut down on high limit. The main burners will shut OFF and the main blower and combustion blower should continue to run.
SEQUENCE OF OPERATION DIRECT IGNITION SYSTEM CONTROL 20571201 Issue 0527 Page 23 of 28.
SERVICING THE FURNACE ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in dangerous operation, serious injury, death or property damage. Improper servicing could result in dangerous operation, serious injury, death or property damage.
4. Disconnect wires from rollout switch. 5. Remove manifold or burner/manifold assembly. Manifold ONLY a. Remove the No. 10 screws that secure the manifold pipe to both legs of the manifold assembly. The manifold pipe must be supported during this step, or it could fall and damage the furnace or cause bodily injury! b.
TROUBLE SHOOTING With LED Indicator Assistance Troubleshooting Make the following visual checks before toubleshooting: 1. Check to see that the power to the furnace and the integrated ignition/blower control board is ON. 2. The manual shutoff valves in the gas line to the furnace must be open 3.
WIRING DIAGRAM 20571201 Issue 0527 Page 27 of 28.
NOTES 20571201 Issue 0527 Page 28 of 28.
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il Allied Air Enterprises Upflow è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del Allied Air Enterprises Upflow - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso Allied Air Enterprises Upflow imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul Allied Air Enterprises Upflow ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il Allied Air Enterprises Upflow, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del Allied Air Enterprises Upflow.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il Allied Air Enterprises Upflow. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo Allied Air Enterprises Upflow insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.