Manuale d’uso / di manutenzione del prodotto EZ 250 del fabbricante Eiki
Vai alla pagina of 30
EZ250 L Owners Manual.
i.
i i T able of Contents EZ 250 Part s List 1 Items Provided by Installer 2 Preloaded Eiki Code 3 Preloaded T imer 4 EZ 250 Layout 5 EZ 250 Sof tware Installations 6 Programming EZ 250 7-17 Labeling But.
i ii.
-1 - EZ 250 P ar ts List • EZ 250 • AC/DC Power Supply • EZlink Hub • Plug and Play Set Up Guide • 2 Screws • 2 Label T ransparency Sheet s.
-2 - Items Provided by Inst aller • If you are going to need to program the EZ -250, a DB 9 serial cable to connect your computer to EZ 250 • Slotted screw driver • Hex driver • 2 pieces of st.
-3 - Preloaded Eiki Code PLUG AND PLAY SET UP Y our EZ-250 system is set to operate right out of the box. It has been pre-configured to work with the current line of EIKI projectors. If you are using one of the projectors list ed below si mply connect the control cable from the projector to the RS-232c port on the EZ-25 0 interface.
-4 - Preloaded T imers The controller is preloaded with different ti mers that will turn of f the projector after a specified period. This func tion can be selected by pressing button 9 down for 30 seconds, after the button st arts to blink, continue pressing the button down.
-5 - EZ 250 Layout RS-232-2 Programming Port Also goes into the NPC 1 and when tw o projectors are hooked up RS-23 2-1 Hooked up to projector when using N PC-1 also hooked up to another device w hen N.
-6 - EZ 250 sof tware Inst allation 1. Goto http://www .eiki.com 2. Then select EZ 250 Software 3. Save to your PC 4. Then install the progr am from your desktop.
-7 - Programming EZ 250 (Best viewed in 1024 x 768 or higher) 1. T o connect your EZ 250 controller to your EZlink Hub interface take two (2) standard cat5 cables and connect the first cable between E.
-8 - Reset Button Reset Button 5. Select open Note: a pre-existing file may be modified fo r current user specs once it is opened. 6. Select the Upload New Configuration to Control Button Or 7. The software will prompt you to pre ss the reset button. (reset button is located on the back of the EZ 250) 8.
-9 - Reset Button 5. Select Manufacturer 6. Select Model this will provide default codes to the EZ 250 7. Press the Select Button 8. Select the Upload New Conf igur ation to Control Button Or 9. The software will prompt you to pre ss the reset button.
- 10 - Reset Button 10. Af ter the programming status dis appears disconnect the cables from the computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 S t andard Programming for 2 Devices 1.
- 11 - Reset Button Reset Button 9. Press the Select Button 10. Select the Upload New Configuration to Control Button Or 11. The sof tware will prompt you to pre ss the reset button.
- 12 - Reset Button Reset Button 5. The software will prompt you to pre ss the reset button. (reset button is located on the back of the EZ 250) 6. After the programming st atus dis appears disconnect.
- 13 - Reset Button Reset Button 4. The software will prompt you to pre ss the reset button. (reset button is located on the back of the EZ 250) 5. After the programming st atus dis appears disconnect the cables from the computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 6.
- 14 - Note: This will setup contacts to momentarily close when button is pushed. Contacts can be setup to latch. See the custom programming section of this manual to learn more. Custom Programming 1. Same as steps 1 thru 7 in S t andard Programming 2.
- 15 - Reset Button Reset Button 5. Enter the RS232 command then select OK 6. Select Upload New Configuration to Control Or 7. The software will prompt you to pre ss the reset button.
- 16 - T imer Programming This Feature allows you to select a time r that will shut off t he devices that are contacted to the EZ 250 for the time you select.
- 17 - Labeling Buttons 1. Using scissors cut out the label s from sheet of transparencies (Refer to EZloader button layout for placement of label) 2. Remove the button cap from EZtrol ’ s front panel with a thin blade 3. With a thin blade lift the top up of the lens fr om the dif fuser Dif fuser Lens 4.
- 18 - 6. Place Diffuser back into lens and t hen back onto Controller , repeat until all 10 buttons are identified. 7. If the Label you need is not on th e printed sheet then open up EZ 250 software 8. After EZ 250 sof tware is open select labels 9. Select layout 10.
- 19 - Inst allation of EZ 250 Inst alling EZ 250 with ONE Device 1. Pull the two pieces of Cat 5 cable from the controller location to the data projector location 2. Place the EZlink interface near the data projector location. This is recommended because you will already ha ve a 1 10v power outlet there.
- 20 - Inst alling EZ 250 with TWO Devices 1. Follow steps 1 – 7 in Inst all EZ 250 with 1 device for the first device 2. For the second device pull a DB9 serial cable from the EZlink interface to the second device location 3. Connect the cable that is coming fr om the device into the port that you selected during programming.
- 21 - Inst alling EZ 250 with another EZ 250 1. Follow steps 1 – 7 in Inst all EZ 250 with 1 device for the first device 2. If connecting to another EZ 250 connect a db9 female to female cable between the RS232- 2 port on the first EZlink interface and the RS232-2 port on the second EZlink interface.
- 22 - T wo EZ 250 s.
- 23 - Inst alling EZ 250 with the option of the cont act closures 1. Follow the steps in “Inst alling EZ 250 with 1 Data Projector” or “Inst alling EZ 250 with 2 Data Projectors ” or “Installing EZ 250 with a LSE Device and a Data Projector” to connec t with your data projector .
- 24 - Inst alling a EZ 250 with a NPC-1 1. Pull the two pieces of cat5 cable from the controller location to the data projector location 2. Place the EZlink interface near the data projector location. This is because there is already a 100v outlet there.
- 25 - When connecting to program the EZtrol 250 with a standard DB9 Cable into RS-232 -2 When connecting to devices on either RS-232-1 or RS-232-2 w ith a standard DB9 Cable When connecting to device.
- 26 - EZ 250 Sof tware T roubleshooting 1. Make sure that the connections are seated tightly 2. Check dip switch settings 3. Are you connected to RS 232 Port (2)? 4. If you do something in changing the bu ttons that you didn’t want to do, select the restore factory setup butt on.
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il Eiki EZ 250 è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del Eiki EZ 250 - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso Eiki EZ 250 imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul Eiki EZ 250 ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il Eiki EZ 250, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del Eiki EZ 250.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il Eiki EZ 250. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo Eiki EZ 250 insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.