Manuale d’uso / di manutenzione del prodotto PMF3XS-B del fabbricante APC
Vai alla pagina of 24
Inst allation and Operation Manual APC Brick Panel Product s PMF3XS-B PMJ3XS-B PMP3XS-B PMH3XS-B PMG3XS-B PML3XS-B.
The Brick Panel Product Surge Protective Devices (SPD) are designed to deliver specification grade performance at the service entrance, branch panels or other critical locations.
Installation and Operation Ma nual 3 Precautions ........ .............. .............. .............. .............. .............. .............. ... 4 Introduction .. .............. .............. .............. .............. .............. ......
4 Installation and Operation Manu al Precautions At end-of-life conditions, Surge Protective Devices ( SPDs) can lose their ability to block power system voltage and attemp t to draw excessive current from the line.
Installation and Operation Ma nual 5 Table 1: SPD Per Phase I 2 tI appar ent I p I th PM_3XS-B 175 kA 2 seconds 17,000 A RMS 40,000 A RMS 220 A CA UTION LOSS OF SURGE SUPPRESSION • Do not energize t.
6 Installation and Operation Manu al Introduction Thank you for choosing the APC SurgeArrest ® PM_3X Series “Brick” Su rge Protective Device. The APC non-modular Surge Protecti ve Device (SPD) is.
Installation and Operation Ma nual 7 D ANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH • Apply appropriate p ersonal protective equipment (PPE) and foll ow safe electrical wo rk pr act ices. See NFPA 70E. • This equipment must onl y be inst alled and serviced by qualified electrical personnel.
8 Installation and Operation Manu al Unpacking and Preliminary Inspection Inspect the entire shi pping containe r for damage or sig ns of mishandling before unpacking the device. Remove the packing mate rial and further inspect the device for any obvious shipping damage .
Installation and Operation Ma nual 9 Electrical Voltage Rating Prior to mounting the SPD, verify that th e devi ce has the same voltage rating as the power distribution system in which it is installe d. Compare th e nameplate voltage or model number on the SPD with the namep late of the electrical distribution equipment.
10 Installation and Operation Manu al Terminals, Wire Size, and Installation Torque Terminals are provided for phase (line), neutral, an d equipment ground connections. The SPD termin als accept a range of 12 AWG (3 mm 2 ) to 2 AWG (34 mm 2 ) copper wire for phase, neutral, and ground conn ectors.
Installation and Operation Ma nual 11 Location of SPD Install Type 2 SPDs on the load side of th e main Overcurrent Protection De vice (OCPD) to comply with NEC Article 28 5 for Type 2 SPDs. Locate the SPD as close as possible to the circuit being ad dressed to minimize the wire length and optimize SPD perfo rmanc e.
12 Installation and Operation Manu al Grounding The SPD has leakage current to ground when energized and can present a hazardous touch voltage. The device has SPD elements conne cted from phase to ground.
Installation and Operation Ma nual 13 Installation Conduit Location and Recommendations The recommended conduit entry is at the bottom of the device enclosure.
14 Installation and Operation Manu al Wiring Follow the step s listed below when making wi ring connections. 1. Turn off all power supplying this equip ment before working on or i nside any enclosure containing this equipment.
Installation and Operation Ma nual 15 Wiring Diagrams without Integral Switch Figure 3: SIngle-Phase , T hree-Wire, Grou nded Installati on Figure 4: Three-Phase, Three- or Four-Wire, Ground ed Wye Installation Figure 5: Three-Phase, Three- or Four -Wire, High-Leg Delta Installation N 8222-0013-04 SPD A N C Made in U S A / Hecho en E.
16 Installation and Operation Manu al Operation LED Status Indicators The diagnostic display panel shows the sta tus of the SPD module with diagnostically controlled gree n/red LEDs. If a unit is operating correctly, a ll the phase LEDs will be illumin ated green.
Installation and Operation Ma nual 17 When power is applied to the SPD and one or more of the diagnostic display panel LEDs are red, and one or more modul e LEDs are out, the module sho uld be replaced. Refer to “Maintenance and Tr oubleshooting” on page 19 for prop er troubleshooting procedu res.
18 Installation and Operation Manu al Dry Contacts The SurgeArrest ® series SPDs come standard with dry contacts. The connection for the dry contacts is located on the back of the diagnostic display panel (lower right corner). The dry cont acts are 3-posi tion, Form “C” type with Normally Open, Normally C losed and Common conn ections.
Installation and Operation Ma nual 19 Maintenance and Troubleshooting Preventive Maintenance Inspect the SPD periodically to main tain reliable system performance and continued transient voltage surge suppression. Periodicall y check the state of the diagnostic displ ay panel LED status ind icators.
20 Installation and Operation Manu al Troubleshooting If a module shows two gree n indicator lights and the di splay panel shows a red phase indicator light, follow the Troubl eshooting Flow Chart in Figure 9 below. Replac ement Pa rts The following replacement part s are available.
Installation and Operation Ma nual 21.
22 Installation and Operation Manu al.
Installation and Operation Ma nual 23.
APC Worldwide Customer Support Customer support for this or other APC products is available at no charge in the fo llowing ways: • Visit the APC website to access documents in the APC Kn owledge Base and to submit customer support requests. — www.
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il APC PMF3XS-B è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del APC PMF3XS-B - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso APC PMF3XS-B imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul APC PMF3XS-B ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il APC PMF3XS-B, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del APC PMF3XS-B.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il APC PMF3XS-B. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo APC PMF3XS-B insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.