Manuale d’uso / di manutenzione del prodotto BH 105 del fabbricante Hearth and Home Technologies
Vai alla pagina of 49
.
.
H opper Li d L at c h es H opper C on tr o l B oard Co v er C on tr o l B oard C om b u s t i o n B l o w er C om b u s t i o n B l o w er Co v e r T e m p er a t u re / Press ure G a uge Pre ss u.
.
ECO-CHOICE™ LIMITED W ARRANTY Hearth & Home T echnologies Inc., on behalf of its Heatilator® brand (”HHT”), extends the following warranty for all ECO-CHOICE™ furnace and boiler products (“Products”) that are purchased from an HHT authorized dealer .
Boiler Kit Materials: (Refer to page 2) List of items contained within the boiler kit shipped with the unit. 1 - Control board cover 1 - Access cover (Hopper Swing Plate K.
Design: The rst thing that needs to be done is deciding where and how the boiler will be installed. Things that need to be taken into consideration are the intended use of the boiler for example, is the boiler going to be used as your primary heating system or is it going to be used as a secondary or backup heating system.
NOTE: All installation clearances and restrictions must be adhered to. INST ALLA TION IS TO BE PERFORMED BY A QUALIFIED INST ALLER. NOTE:Use only 4” diameter type “L” or “PL” venting system. Be sure to inspect and clean exhaust venting system frequently .
Requirements for T erminating the V enting W ARNING: V enting termi nals must not be recesse d into a wall or siding. NOTE: Only PL vent pipe wall pass-throughs and re stops should be used when venting through combustible materials.
Fig. 3 A voiding Smoke and Odors - Negative Pressure, Shut-down and Electrical Power Failure. T o reduce the pr obability of back-drafting or burn back in the pellet boiler during a power failure, it must be able to draft naturally without exhaust blower operation.
V enting 4” T ype “L” or “PL” V ent pipe This is the minimum venting conguration. Fig. 5 - Fig. 4 + The minimum vent conguration is a 90 o or T ee on a starter collar and a 24” length horizontal through an exterior wall.
Chimneys taller than 20’ above the connection will require a draft test to determine if the draft is too high. Note: The high burn draft should not exceed .85 IWC. Some form of a restrictor plate may be required at the top of high chimneys to reduce the draft.
Outside Air T o install outside air , use 2 3/4” I.D.galvanized steel ex pipe, part # 2-00-08 544 ( 12’ 6” length ) or part # 2-00-08545 ( 25’ length) See Fig. 6. There is a break- away hole on the rear panel which must be removed before connecting the ex pipe.
T o install power to the boiler , rst remove the cover on the 4” X 4” junction box located on the back of the unit. There are several knockout holes provided for the incoming main power wires.
Installing Duct .
Installing Duct/Air Conditioning Boilers intended to be connected to an existing boiler or boiler system shall: 1. Be capable of being installed without interfering with the normal delivery of heated water from the original boiler to the radiation system.
NOTE: AL W A YS REFER TO THE INDIVIDU AL COMPONENTS RECOMMENDED INST ALLA TION INSTRUCTIONS FOR THE PROPER MOUNTING POSITION AND LOCA TION WITHIN THE PIPING SYSTEM.
* PRESSURE RELIEF V ALVE * TEMPERA TURE/PRESSURE GAUGE AIR VENT T YPICAL BOILER HOT WA TER PIPING SHOWING AIR REMOV AL SYSTEM, PROVISIONS FOR THE EXP ANSION OF W A TER AND THE AUT OMA TIC COLD W A TER SUPPL Y .
.
MINIMUM OF 72" OF 3/4" FINNED BASEBOARD (HIGH TEMPERA TURE) BASEBOARD HEA T SYSTEM RETURN SHUT-OFF V ALVE NOTE: .
D ra ft B o lt L oc at io n Vi e wing W i ndow Ai r was h S l o t Fi r ebox Door Fig. 9 “T est” Low Draft Adjustment Pot Fig. 10 Fig. 1 1 Covered Un-Covered Air W ash Slot Draft T est Procedure After the venting is completed, the rebox low draft will need to be checked and possibly adjusted.
Fuel and Fuel Storage Pellet fuel quality can uctuate from manufacturer to manufacturer , and even from bag to bag. Hearth & Home T echnologies recommends using only fuel that is certied by the Pellet Fuels Institute (PFI).
Power Light Indicates power to the contr ol boar d. Status Light W ill be lit anytime ther e is a call for heat. Combustion Blower Light Indicates Power to combustion blower Feed Motor Ligh t Indica tes Power to the feed motor .
Contr ol Board Operation Aquastat Sensor - This sensor is located in the aqua- stat well on the top of the water jacket. This sensor along with the outdoor air sensor is what the control board uses to regulate the feed rate based on these two observed conditions.
.
1. T urn Mode Selector to “OFF”. This resets the control in addition to turning it off. Starting A Fire Automatically 3. Fill Hopper with pellets. When lling the hopper check for excessive nes in the bottom of the hopper .
4. If Starting After an Empty Hopper , T urn Feed Adjuster to “TEST” (for one 60 second cycle). This will feed pellets into the auger tube and also allow you to check the motors for operat ion. NOTE: The auger motor will not operate with any of the doors open.
8. T urn the MIN. TEMP . Dial on the control board to the desired Minimum temperature. This will start the lighting process if the temperature at the aquastat sensor is approximately 5° F . less than the set temperature on the MAX TEMP . dial.
NOTE: Stirrin g the starti ng gel into the pellet s usually allows the r e to become established quicker . CAUTION: A vapor ash could occur if too much time is allowed to pass before lighting the starting gel. CAUTION: Care must be taken not to get starting gel on your hands or clothing.
Fig. 18 Burnpot Cleaning: The burnpot should be cleaned no less than once a week. For best operation the burnpot should be cleaned every time the hopper is lled with pellets. The re does not have to be out to scrape the burnpot although it is recommended the boiler be on minimum burn at the time of cleaning.
Fig. 21 A s h Door Handl e A s h Door A s h P a n A s h P a n Handl e Ash Removal It is recomme nded to remove the ashe s when the boile r is not in oper ation . This lessen s the chance s of coming in contact with hot surfaces.
Cleaning This cleaning should be done after each ton of pellets used. The frequency of this cleaning w ill be directly related to the quality and the ash content of the pel- lets being used. Keep in mind that the cleaner the heat exchanger surface is kept, the higher the heat transfer efciency will be.
The boiler MUST be OFF and COOL before you should attempt to clean the combustion blower . The wire to the combustion blower doesn’ t need to be disconnected during the cleaning process. Loosen the three (3) thumb screws about 4 turns each.
.
.
.
.
.
.
.
.
BTU Input Range= 0, and 9350 to 1 13,900* 0 BTU if system is satised. Min. Burn = 1.1 pound per hour Max. Burn = 13.4 pounds per hour * 8500 BTU per pound gures Electrical 120 V AC 60 Hz Combustion blower 1.
GREEN/YELL OW DARK BL UE PELLET BOILER WIRING DIAGRAM 4" SQUARE JUNCTION BO X BLACK GREEN/YELLOW WHITE RED RED WHITE GREEN 3/8"FLEX CONDUIT BROWN WHITE WHITE WHITE RED DARK BLUE AUX.
“105 Series” PELLET BOILER WHITE GREEN Relay enclosure box - GRAINGER # 1EGH7 RED RED WHITE GREEN DPDT RELA Y flange mtd.
W ood Hearth & Home T echnologies, Inc. W ARNING: R isk of fire - Do not operate with the flue draft ex ceeding -.9 in W ater Column / -224P a. A T TENTION: Risque de feu - Ne fonctionnez pas avec l'ébauche deconduite de cheminée excédan t -.
Date Of Service Performed By Description Of Service.
Proudly P rinted On 100% Recycled P aper.
1 T urn Mode Selector to OFF . 2 Use heat exchanger cleanout r ods to clean the heat exchanger tubes.** 3 Scrape the air holes in the burnpot.** 4 Fill the hopper with pellets. 5 T urn Feed Adjuster to “T est”.* 6 Check the Combustion Blower and Feeder Motor for operation.
At Harman, we build each pr oduct to a standard, not a price. This pow erful heating appliance boasts uncompr omising attention to detail and helps preserve our planet by using envir onmentally responsible fuels.
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il Hearth and Home Technologies BH 105 è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del Hearth and Home Technologies BH 105 - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso Hearth and Home Technologies BH 105 imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul Hearth and Home Technologies BH 105 ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il Hearth and Home Technologies BH 105, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del Hearth and Home Technologies BH 105.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il Hearth and Home Technologies BH 105. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo Hearth and Home Technologies BH 105 insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.