Manuale d’uso / di manutenzione del prodotto KSZ120 del fabbricante Crown Boiler
Vai alla pagina of 36
1 KSZ Series Oil-Fired Steam Boilers INST ALLA TION INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler Models: • KSZ065 • KSZ075 • KSZ100 • KSZ090 • KSZ125 • KSZ150 • KSZ120 • KSZ175 • KSZ200 CROWN Boiler Co CROWN Boiler Co T el: (215) 535-8900 • Fax: (215) 535-9736 • www .
2 T able of Contents I. Product Description .............................................................. 1 II. Specifications ........................................................................ 1 III. Before Installing .........................
3 TABLE 1a: GENERAL SPECIFICATIONS Notes: 1. Net Ratings are based on piping and pick-up allowances of 1.333. 2. Burner Capacity Rating, GPH is based on #2 oil with a Gross Heating Value equal to 140000 BTU/Gal. 3. Maximum Working Pressure, Steam -15 PSI.
4 3) Make sure that the boiler is correctly sized. Use an industry accepted sizing method such as the I=B=R Installation Guide for Residential Hydronic Heating Systems and I=B=R Heat Loss Calculation Guide (Pub. #H21 or #H22) published by the Hydronics Institute in Berkeley Heights, NJ.
5 FIGURE 2: CLEARANCES 0. 47" Sh e e t M e t a l ( 2 4 G A o r T hic k e r ) H ol l ow M a s on r y B l oc k s O p e n ing s Alig n e d T o P er mi t F r e e A i r Ci r c u l a ti on 4“ MI N .
6 For Buildings of Other than Unusually Tight Construction 1) Determine whether the boiler is to be installed in a confined space - A confined space is defined as having a volume less than 50 cubic feet per 1000 BTU/hr input of all appliances installed in that space.
7 FIGURE 4: BOILER INSTALLED IN CONFINED SPACE, ALL AIR FROM INSIDE 6 FIGURE 5: ALL AIR FROM OUTDOORS, VENTILATED CRAWL SPACE AND ATTIC.
8 7 FIGURE 6: ALL AIR FROM OUTDOORS, VIA VENTILATED ATTIC FIGURE 7: ALL AIR FROM OUTDOORS, USING OPENINGS INTO BOILER ROOM.
9 FIGURE 8: ALL AIR FROM OUTDOORS, USING HORIZONTAL DUCTS INTO BOILER ROOM 8.
10 FIGURE 9: TYPICAL VENT SYSTEM INSTALLATION AND COMPONENTS VI V enting Vent installation must be in accordance with local building codes, or the local authority having jurisdiction. Typical vent installation is illustrated by Figure 9. The components of vent installation are the vent connector (breeching), barometric draft regulator, and chimney.
11 6) Prior to boiler installation, inspect chimney for obstructions or other defects and correct as required. Clean chimney as necessary. 7) Vent pipe should slope upward from the boiler not less than one inch in four feet. No portion of vent pipe should run downward or have sags.
12 FIGURE 10: STEAM BOILER PIPING FOR GRAVITY RETURN CAUTION • INSTALL BOILER SO THAT ALL ELECTRICAL COMPONENTS ARE PROTECTED FROM WATER (DRIPPING, SPRAYING, RAIN, ETC.) DURING APPLIANCE OPERATION AND SERVICE. • OPERATION OF THIS BOILER IN A SYSTEM HAVING SIGNIFICANT AMOUNTS OF DISSOLVED OXYGEN CAN CAUSE SEVERE HEAT EXCHANGER CORROSION DAMAGE.
13 2) One-pipe steam systems require air vents on each radiator, as well as at the end of each main. For the system to work properly, these vents must be properly installed, sized, and be in good condition. Inspect and replace any defective vents. If there are no vents at the ends of the mains, install them.
14 VIII INDIRECT & T ANKLESS W A TER HEA TER PIPING INDIRECT WATER HEATER PIPING All KSZ series boilers are equipped with tappings to permit the connection of a Crown Mega-Stor, or other indirect water heater.
15 IMPORTANT • Some indirect water heaters may not be suitable for use with a steam boiler. Consult the water heater manufacturer’s guidelines before installing it in this type of system.
16 15 5) Globe or Ball Valve (Recommended) - Used to adjust the flow through the entire tankless heater system if needed. 6) Unions (Required) - Tankless heaters may require periodic gasket replacement or other maintenance which requires removal of the heater from the boiler.
17 IX Fuel Line Piping Fuel line piping design, materials and constructions must be in accordance with local building codes, requirements of the local authority having jurisdiction, and the latest edition of Installation of Oil-Burning Equipment (ANSI/NFPA 31).
18 17 c) TWO-PIPE GRAVITY SYSTEM (not recommended) - Used when a fuel oil storage tank is located above an oil burner fuel pump. See Figure 15. A vertical distance from top of the tank to center line of the pump (Dimension ‘H’) over 8 feet will result in a pump inlet pressure in excess of the 3-psi limit in NFPA-31.
19 18 Once the type of system has been selected, observe the following: 1) Fuel line piping must be airtight. Do not use compression type fittings for tubing connections in fuel line piping. Use only listed flare type fittings. Cast iron threaded fittings shall not be used for wrought iron or steel piping connections.
20 X W iring WARNING All wiring and grounding must be done in accordance with the authoity having jurisdiction or, in the absence of such authority, with the National Electric Code (ANSI/NFPA70). 1) 120 V olt W iring - Provide the boiler with its own 15A branch circuit with fused disconnect.
21 FIGURE 17: INDIRECT WATER HEATER FIELD WIRING 20 Feeder Wiring for Boilers Equipped with Hydr olevel CG450 Low W ater Cut-offs 1) Using Hydrolevel VXT-120 feeder - Do not alter factory boiler wiring. Connect VXT-120 to CG450 as follows: • Connect the BLACK lead on the feeder to terminal A on the CG450.
22 FIGURE 18a: WIRING MCDONNELL & MILLER 101A-120 OR HYDROLEVEL VXT -120 FEEDER T O BOILER EQUIPPED WITH #67 L.W .C.O. FIGURE 18b: WIRING MCDONNELL & MILLER WF2-U-120 FEEDER 21.
23 FIGURE 19: WIRING (MCDONNELL & MILLER #67 LWCO) FIGURE 20: WIRING (HYDROLEVEL CG450 LWCO) 22 L1 I N TE R R U P TE D INT E R M IT TE N T BURNER M O T O R LI M I T VA L VE L2 NO T E : B U R N E R W IR IN G S H OW N I S F OR B E CK E T T AF G B UR NE R S .
24 XI Start-up and Checkout WARNING • NEVER ATTEMPT TO FILL A HOT EMPTY BOILER. • MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER FLAMMABLE VAPORS AND LIQUIDS.
25 24) Verify primary control operation and safety features according to procedure outlined in the instructions furnished with control. 25) Check pressure limit control operation. Jump thermostat terminals and allow burner to run until boiler pressure exceeds cut-in pressure plus the differential.
26 TABLE 3b: CARLIN BURNER CONFIGURATION AND SETUP DATA TABLE 3a: BECKETT BURNER CONFIGURATION AND SETUP DATA 25 KSZ065 KSZ075 KSZ100 KSZ090 KS Z125 KSZ150 KSZ120 KSZ175 K SZ200 BUR N ER M O DEL EZ-1HP EZ-1HP EZ-1HP EZ-1HP EZ-1HP EZ-1HP EZ-1HP EZ-2HP STANDARD DEL.
27 26 TABLE 3c: RIELLO BURNER CONFIGURATION AND SETUP DATA XII Service and Maintenance The following procedure should be performed on a weekly basis: For boilers equipped with a #67 low water cut-off, blow down the low water cut-off following the instructions on the yellow sticker adjacent to the low water cut-off.
28 27 4) Clean the boiler flue passages as follows: a) Remove vent connector and piping. b) Remove barometric draft regulator. c) Remove top jacket panel to gain access to boiler flue collector. d) Unscrew four wing nuts and remove canopy retaining carriage bolts, lift off the canopy and ceramic fiber sealing strips.
29 IMPORTANT • CLEAN THE BOILER EVEN IF THERE ARE NO SIGNIFICANT SOOT DEPOSITS. FAILURE TO REMOVE ALL SULFUR AND ASH DEPOSITS ANNUALLY CAN CAUSE SEVERE CORROSION DAMAGE. • WHEN CLEANING THE REAR FLUE PASSAGE, BE CAREFUL NOT TO PUSH THE BRUSH TOO FAR BEYOND THE BOTTOM OF THE PINS.
30 29 Important Product Safety Information Refractory Ceramic Fiber Product Warning : The Parts list designates parts that contain refractory ceramic fibers (RCF).
31 30 Installation Notes And Service Log.
32 31 65 75 100 90 125 150 120 175 200 1 COMPLETE HEAT EXCHANGER ASSY. 1 ea. 2800135 2800135 2800135 2800145 2800145 2800145 2800155 2800155 2800155 * FRONT SECTION 275051 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. * REAR SECTION 275062 1 ea.
33 32.
34 33 6 5 7 5 100 9 0 125 15 0 12 0 17 5 20 0 40 LEFT SIDE JACK E T P AN E L 1 ea. 270233 270233 270233 270234 270234 270234 270235 270235 270235 41 RIGHT SIDE JAC K ET P A NE L 1 ea. 2702235 2702235 2702235 2702245 27 02245 2702245 2702255 2702255 2702255 * REA R JAC KE T PANE L 270220 1 ea.
35 34.
36 T el: (215) 535-8900 • Fax: (215) 535-9736 • www .crownboiler .com Manufacturer of Hydronic Heating Products P .O. Box 14818 3633 I. Street Philadelphia, P A 19134 CROWN Boiler Co Rev 9- 20-10.
Un punto importante, dopo l’acquisto del dispositivo (o anche prima di acquisto) è quello di leggere il manuale. Dobbiamo farlo per diversi motivi semplici:
Se non hai ancora comprato il Crown Boiler KSZ120 è un buon momento per familiarizzare con i dati di base del prodotto. Prime consultare le pagine iniziali del manuale d’uso, che si trova al di sopra. Dovresti trovare lì i dati tecnici più importanti del Crown Boiler KSZ120 - in questo modo è possibile verificare se l’apparecchio soddisfa le tue esigenze. Esplorando le pagine segenti del manuali d’uso Crown Boiler KSZ120 imparerai tutte le caratteristiche del prodotto e le informazioni sul suo funzionamento. Le informazioni sul Crown Boiler KSZ120 ti aiuteranno sicuramente a prendere una decisione relativa all’acquisto.
In una situazione in cui hai già il Crown Boiler KSZ120, ma non hai ancora letto il manuale d’uso, dovresti farlo per le ragioni sopra descritte. Saprai quindi se hai correttamente usato le funzioni disponibili, e se hai commesso errori che possono ridurre la durata di vita del Crown Boiler KSZ120.
Tuttavia, uno dei ruoli più importanti per l’utente svolti dal manuale d’uso è quello di aiutare a risolvere i problemi con il Crown Boiler KSZ120. Quasi sempre, ci troverai Troubleshooting, cioè i guasti più frequenti e malfunzionamenti del dispositivo Crown Boiler KSZ120 insieme con le istruzioni su come risolverli. Anche se non si riesci a risolvere il problema, il manuale d’uso ti mostrerà il percorso di ulteriori procedimenti – il contatto con il centro servizio clienti o il servizio più vicino.